Construction handover · Remote UK service

O&M manuals without the final-week scramble.

We organise your drawings, certificates, warranties and asset information into an indexed handover pack—and show you exactly what still needs attention.

Each pack is checked against your supplied documents before delivery. Scope and price are agreed before work starts.

Before you begin: place the project PDFs in one Google Drive folder, share it with hassan@propertypacklondon.co.uk as a viewer and keep the folder link ready.

What's included

Your evidence, structured for handover.

For contractors, fit-out teams and specialist installers. The proposal defines the deliverables for your project.

01

Document register

Submitted files classified and tracked against the agreed requirements.

02

Indexed O&M manual

A consistent PDF with contents and revision information, assembled from your source documents.

03

Asset information

Available manufacturer, product and warranty details organised into an asset register.

04

Exceptions list

Missing, contradictory and unsuitable evidence made visible for resolution.

05

Maintenance information

Available manufacturer instructions summarised into an agreed maintenance schedule.

06

Reviewed final issue

The specified final PDF delivered to your nominated email, with the original evidence retained separately.

How it works

Scope. Collect. Review. Issue.

  1. Agree the project

    Provide the scope and file estimates. Confirm the fixed price, sign the agreement and pay before work starts.

  2. Share your evidence

    Supply authorised project files. We organise the sources and identify gaps.

  3. Resolve and review

    Resolve missing or conflicting mandatory evidence. We check the assembled pack against the sources.

  4. Approve release

    Final delivery requires payment, acceptance of every mandatory item and explicit release approval.

Clear pricing

A fixed price before you commit.

Package eligibility depends on page, subcontractor and system counts. All limits in a package apply.

Essential

£395

  • Up to 150 source pages
  • Up to 3 subcontractors
  • Up to 2 systems

Professional

£695

  • Up to 500 source pages
  • Up to 10 subcontractors
  • Up to 4 systems

Complex

From £995

For scopes above any Professional limit.

Add £175 per additional 500 pages or part thereof above 500, and £150 per additional 10 subcontractors or part thereof above 10.

Optional additions: Regulation 38 information collation £250; priority handling £150, subject to capacity. Collation does not certify fire safety or replace missing evidence.

Delivery target: five business days after cleared payment and receipt of the complete source set, subject to the agreed scope. Missing or contradictory mandatory evidence must be resolved before final release.

We are currently not VAT registered, so no VAT is added. Your project-specific proposal confirms the total fee, scope and delivery terms.

Start with a defined scope

Tell us what needs handing over.

Include the project type, target date, estimated pages, subcontractors, systems and the documents already available.

Prepare your source folder first: place the project PDFs in one Google Drive folder, share it with hassan@propertypacklondon.co.uk as a viewer, then paste the folder link into the Source Folder URL field.

The enquiry opens our online project form. Share only information you are authorised to provide. See our privacy notice for how project information is processed.

Open project enquiry

Clear responsibility

We organise and present client-supplied information. We do not certify installations, create missing statutory evidence or replace designers, contractors, specialists or statutory dutyholders. Unresolved mandatory evidence prevents a final release; a review pack is not a completion certificate.